Silicon Valley BART Extension

HMH Engineers performed a critical role on the SVBX C700 Design-Build team that included performing utility coordination for design, preparing plans and specifications for municipal storm drain, sanitary sewer and water system relocations and topographic surveying.

As a key subconsultant to the design joint-venture, HMH was deeply involved in early utility relocation activities, assisting in coordinating relocations of Chevron petroleum lines, major PG&E gas transmission mains and numerous power, telecommunications and water facilities. We were also responsible for design of four critical early relocations of storm drain, sanitary sewer and water facilities, including a 66-inch and 42-inch welded steel transmission lines operated by Santa Clara Valley Water District.

The BART Berryessa Extension is a 10-mile, two-station extension, beginning in Fremont south of the BART Warm Springs Station and proceeding in the former Union Pacific Railroad right-of-way through Milpitas, the location of the first station, and then to the Berryessa area north of San Jose, where the second station is located. This is the first phase of the extension of the existing BART system to Santa Clara County. Phase II is a 6-mile phase that includes a 5.1 mile long subway tunnel through downtown San Jose, and ends at grade in Santa Clara near the Caltrain Station.

Services

  • Civil Engineering
  • Land Surveying
  • Stormwater Compliance

Location

San Jose, CA

Completion

2012-2019

Key Facts

  • Client: LAN - T.Y. Lin JV / SSH JV
  • Delivered early design package for critical water transmission and storm drain lines on schedule.
  • Provided innovative solutions for relocation of utilities to facilitate construction staging.

Let's Talk About Your Project