Villas on the Boulevard

HMH worked with Summerhill Apartment Communities on the completion of a 4-story, 186 unit residential development in Santa Clara. HMH designed both the private and public surface improvements and wet utilities necessary to properly develop the building. In order to comply with the City of Santa Clara standards, complex hydraulic analysis was performed to ensure no more than 6-inches of ponding for a 100-year storm event, which supported the final surface grading design.

In addition, HMH worked closely with the City of Santa Clara, Caltrans and VTA to ensure the public surface improvements accommodated their design to incorporate the relocation of the existing bus stop and future Bus Rapid Transit (BRT) plan.

Services

  • Conceptual Site Plans
  • Stormwater Compliance
  • Civil Engineering
  • Entitlement Management and Processing
  • Construction Staking

Location

Santa Clara, CA

Completion

2012-Present

Key Facts

  • Client: Summerhill Apartment Communities
  • 186 apartments within a 4-story building and 1-level parking garage
  • Building Footprint: 93,251 square feet on a 3.57 acre lot (60% lot coverage)
  • Public street improvements including relocation of an existing VTA bus stop to accommodate a renovated intersection at El Camino Real and Bowers Avenue.

Let's Talk About Your Project